

the Hydrotech Green roof system. A HUGE crane dropped TONS of engineered
soil in the 7 bays on the south lower roof. So very exciting. After the drainage system and soil were in place, the erosion mat of coconut fibers
was laid down, tucked in and staked with what appeared to be clear plastic stakes, but were made of corn starch that will disentegrate. We have about a 6 week window to plant!"
~Chula
No comments:
Post a Comment